* PIT ~ The pit should be deep enough to allow for drainage and ease of cleaning. Silt build up will occur over time. * FOOTING ~ A firm footing is required for both in ground and above ground installations. Depending
on ground conditions, a compacted base is generally more than satisfactory, however if in doubt, a concrete footing should be installed.
* GRID ~ Care should be taken to ensure that the grid sits correctly in relation to the camber of the road. * FILL ~ Compaction of filled areas is critical to successful grid installation and ultimately, grid life. *
SURFACE ~ Ensure that the compacted ground surface is level with the grid rails. Incorrect surface levels will affect the life of the grid.
|